|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BS 1377 : Part 4 : 1990 |
|
| Dry
density/moisture content relationship (rammer) |
|
|
|
|
| Location |
|
|
|
|
Job ref. |
|
|
|
| |
|
|
|
|
Borehole/Pit
no. |
|
|
| Soil description |
|
|
|
|
Sample
No. |
|
|
| |
|
|
|
|
Depth |
|
|
m |
| Test
method BS1377: Part 4: 1990: 3.3/3.4/3.5/3.6* |
Date |
|
|
|
| Procedure 2.5/4.5kg* hand/mechanical rammer* |
|
|
|
|
|
| |
____________layers____________blows per layer |
|
|
|
| |
One litre/CBR* mould |
|
|
Volume of mould (V) |
cm3 |
| |
Single sample/separate batches* |
|
|
|
|
|
| Initial sample mass |
|
g |
Particle
density |
|
|
Mg/m3 |
| Retained on
20mm/37.5mm* sieve |
g |
|
% |
|
|
|
| Test
number |
|
|
|
|
|
|
|
|
| Mass of
mould+base+compacted |
g |
|
|
|
|
|
| |
specimen (m2) |
|
|
|
|
|
|
| Mass
mould+base (m1) |
|
g |
|
|
|
|
|
| Mass compacted
specimen (m2-m1) |
g |
|
|
|
|
|
| Bulk density |
|
|
Mg/m3 |
|
|
|
|
|
| |
P=(m2-m1)/(18.15h) |
|
|
|
|
|
|
| Moisture
content container No. |
|
|
|
|
|
|
| Moisture
content (w) |
|
% |
|
|
|
|
|
| Dry
density |
|
|
Mg/m3 |
|
|
|
|
|
| |
Pd=(100p)/(100+w) |
|
|
|
|
|
|
| *Delete as
appropriate |
|
|
|
|
|
|
|
| |
|
|
Maximum
dry density |
|
|
Mg/m3 |
| |
|
|
Optimum
moisture content |
|
|
% |
|
|
|
|
|
|
|
|
|
| dry density
Mg/m3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Moisture Content % |
|
|
|
|
|
|
| |
|
|
Operator |
|
Checked |
|
Approved |
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
Form 4A |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|